New Construction, Alterations, Additions, Pools or Pool Enclosures

FeeCost
Application Fee (non-refundable).075% of the documented value of the construction with a $5 minimum
Plan Review (non-refundable).45% of the documented value of construction
Permit Fee.75% of the documented value of the construction with a $35 minimum
Inspection Fee.45% of the documented value of the construction.
Factory built house, mobile home (includes building, electrical. plumbing and mechanical)$150
Tents and air supported structures$75
Building moving$75
Demolition of Structure$75